Notice the
gravel inside and under the foundation. This is real important to
keep the floor and walls dry after backfill and final grading.
...Here
you see the footing drain installed waiting to be covered with
#2 stone. The foundation gets backfilled after the floor deck
or placing the modular home.
MANUFACTURED
HOMES...need a level
smooth pad to be placed on. We compact a base of gravel and stone
before pouring our slabs.
...GARAGE
AND CELLAR floors are a breeze.
We use our lazer level transit to grade before we pour the concrete.
We pour a special concrete floor mix. We then screed it
to set the aggregate and bring the cream up. This assures
a smooth strong finish!